Recommendation
No objection to the issuance of a permit for the installation of a solar power array on the roof of an existing house, to replace portions of an existing solar hot water array, and for modifications to other portions of the existing array, as shown in materials received and dated 6 September 2013 and supplemental materials received and dated 18 September 2013, pending the receipt of revised drawings and supplemental materials. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.