Recommendation
No objection to issuance of permit for proposed alterations to storefront ONLY as shown in supplemental drawings received and dated 27 January 2003 which indicate masonry opening on first floor aligning with windows above and a 1'-3" tall base for the storefront as recommended during concept review (OG 02-110). See separate review under OG 03-92 which indicates in supplemental drawings the retention of second floor of front portion of building to preserve its historic character as perceived through the new storefront. Alterations to side elevation are NOT part of this application. See previous Recommendation for new replacement brick stoops as reviewed under case OG 02-117. Proposed replacement windows on front facade as shown in supplemental drawings received and dated 4 March 2003 were NOT approved. Note is made that permit application is pending final zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval. File separate submission of working drawings, including details, with permit applications for sign and for window replacement for review by the Commission when ready.