Recommendation
Recommend AGAINST proposed revisions to approved concept design. See previous Recommendation (OG 04-18). Recommend further study of concept design that retains original footprint and placement of second floor of existing structure, to keep addition to upper floor as low as possible. Proposed trellis, connector, chimney, side addition and increase in height were NOT approved. File new concept submission, with photographs for alterations to the front, for review by the Commission when ready. Note is made that project, as proposed, will need zoning variances which should be resolved prior to submission of permit application for review.