Recommendation
No objection to issuance of permit for installation of temporary entrance and ramp at the east elevation of St. Mary's Hall during the new MedStar Hospital building construction, per drawings received 17 August 2018, which indicate the original east elevation entrance would receive the temporary door, the limestone trim and masonry stoop would be carefully protected during the installation of the temporary door and door frame, and the existing aluminum window is reinstalled after removal of temporary entrance. An interior section of the auditorium classroom would be carved out to accomplish this temporary entrance, and a new wood landing, ramp, and stair would be installed at the exterior. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.