Recommendation
No objection to concept design for rear addition, per supplemental materials received 25 April 2022, PROVIDED the awning has open sides, a downspout is placed at east elevation where existing building ends, and the base of the main block of the house remains masonry. File permit submission at DCRA with detailed and dimensioned drawings for review by the Commission.