Recommendation
No objection to concept design to replace sliding doors on the first floor of the rear elevation with French doors in the existing masonry opening, per supplemental materials received 21 April 2023, PROVIDED option 2 is selected and only one coat of loE coating is used. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.