Recommendation
No objection to the issuance of a permit for the installation of six wood replacement windows on the front facade and two aluminum clad windows on the rear facade, as shown in materials received and dated 8 September 2023 and supplemental materials received and dated 19 September 2023, PROVIDED that the windows be installed as full frame replacements with brickmould to match the original, and pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.