HPA number
HPA 24-125
Property
Residence
Description
Reconfigure basement stairs, door replacement, site work
Review Type
Concept
Recommendation
No objection to concept design for installation of metal railing and replacement of basement door, per supplemental materials received 15 February 2024, which indicate that the exterior basement stair would be retained as is, and the existing metal stair with crested brackets would remain in place. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.