Recommendation
No objection to the issuance of a permit for the installation of a rooftop solar panel system at the main building of an existing independent school, as shown in materials received and dated 6 September 2024, PROVIDED that the electrical meter and AC disconnect be painted to match the wall behind and pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.