Recommendation
No objection to the issuance of a permit for the installation of a replacement rear door at the lower level of an existing house, as shown in materials received and dated 2 May 2025 and supplemental materials received an dated 12 May 2025. Door selection and installation method matches a replacement door previously installed at the second floor rear facade. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.