Recommendation
No objection to the final design for new boiler plant equipment at the Sidney R. Yates Federal Building located at 201 4th Street, SW per materials received 31 December 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.