Recommendation
No objection to the issuance of a permit for the installation of a replacement roof membrane, guardrails, ladders, and two mechanical room doors, and for modifications to door and window masonry openings at an existing building, as shown in materials received and dated 4 September 2026, PROVIDED that the color of the proposed guardrail be the same gray as the existing guardrails. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.