Recommendation
No objection to concept design for proposed alterations to fenestration, replacement windows with all-wood 1/1 windows, repair of front door or replacement with a 4 panel door, and rooftop equipment as shown in supplemental drawings dated 12 March 2015, PROVIDED all rooftop equipment is located at the NW corner of the roof. File new submission at DCRA of construction drawings, including detailed and dimensioned drawings, cut-sheets for windows and for mechanical equipment, with permit application for review by the Commission.