Recommendation
No objection to the concept for an addition to an existing rooftop addition and for the modification of an existing rooftop stair enclosure, as shown in materials received and dated 2 June 2023, PROVIDED that no component of the addition or the revised stair enclosure be visible from grade, including from long views, PROVIDED that, in consultation with CFA and HPO staff, the existing electrical and gas meters at the front of the house be relocated, repainted to match the walls behind, and screened with landscape materials, and pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: This is a concept approval only. When ready, submit the permit drawings and a permit application to DOB for review by the Commission.