CFA 22/JAN/15-a
No objection to the concept plans for a new guard booth and modifications to the entrance gates and front fence to improve visitor screening and vehicular access to the Embassy of Ethiopia, as shown in materials received and dated 8 January 2015.
CFA 22/JAN/15-b
CFA 22/JAN/15-c
No objection to the final design for the installation of a rooftop deck and trellis on Pod J at the north eastern corner of the building complex, as shown in materials received and dated 31 December 2014. Approval is conditional on the receipt of the final construction documents. Refer to DC Historic Preservation Office.
CFA 22/JAN/15-d
No objection to the final design for for the construction of a funeral procession queuing area and new surface parking lots for Arlington National Cemetery, near the existing Administration Building, as shown in materials received and dated 8 January 2015.
CFA 22/JAN/15-e
CFA 22/JAN/15-f
CFA 22/JAN/15-g
No objection to the concept design for rehabilitation and modernization of the 14th Street public tour and visitor entrance and bridge structure, as shown in materials received and dated 8 January 2015. The proposal also includes improvements for a pedestrian plaza at the entrance. Refer to DC Historic Preservation Office.
CFA 22/JAN/15-h
CFA 22/JAN/15-i
CFA 22/JAN/15-j
CFA 22/JAN/15-k
CFA 22/JAN/15-l
No objection to the final design for the proposed additions and alterations, including replacement windows, to the former Shadd Elementary School for the DC Scholars Public Charter School, as shown in materials received and dated 6 January 2015. Final design conforms with the approved concept submission.
CFA 22/JAN/15-m
No objection to the final plans for the building rehabilitation, alterations, and additions proposed in the Phase I and 2 modernization projects for the Stanton Elementary School, which includes a new rear classroom wing, as shown in materials received and dated 8 January 2015. Refer to DC Historic Preservation Office.
CFA 22/JAN/15-n
No objection to the concept design for a new entrance vestibule, canopy, equipment screen, and access ramp at the main building entrance to the Martin Luther King, Jr. Elementary School, as shown in materials received and dated 8 January 2015. Refer to DC Historic Preservation Office.
CFA 22/JAN/15-o
No objection to the final design for replacement windows on the John W. Ross Elementary School building, as shown in materials received and dated 8 January 2015. Refer to DC Historic Preservation Office.
CFA 22/JAN/15-p
CFA 22/JAN/15-q
CFA 22/JAN/15-r
CFA 22/JAN/15-s
Project approved by delegation. See letter dated 16 January 2015. Final design conforms with the previous recommendations of the Commission.