CFA 21/JAN/16-a
No objection to the proposed installation of a security camera system at the World War II Memorial, as shown in materials received and dated 6 January 2016, provided cabling is not visible. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-b
No objection to the final plans for the proposed installation of photovoltaic panels on the north and east roof surfaces of the maintenance buildings and on new carports within the interior parking lot of the maintenance yard, as shown in materials received and dated 7 January 2016 and 11 January 2016. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-c
No objection to design for the proposed addition and for the replacement of a concrete ramp at the Volta Park Recreation Center to meet ADA requirements per drawings received 19 November 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-d
No objection to the final design for the installation of rooftop solar panels on the Anacostia High School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-e
No objection to the final design for the installation of rooftop solar panels on the Browne Education Campus, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-f
No objection to the final design for the installation of rooftop solar panels on the Burrville Elementary School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-g
No objection to the final design for the installation of rooftop solar panels on the Deanwood Recreation Center, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-h
No objection to the final design for the installation of rooftop solar panels on the Kramer Middle School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-i
No objection to the final design for the installation of rooftop solar panels on the D.C. Municipal Warehouse, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-j
No objection to the final design for the installation of rooftop solar panels on the Randle Highlands Elementary School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-k
No objection to the final design for the installation of rooftop solar panels on the Raymond Education Campus, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-l
No objection to the final design for the installation of rooftop solar panels on the Southeast Tennis and Learning Center, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-m
No objection to the final design for the installation of rooftop solar panels on the Sousa Middle School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-n
No objection to the final design for the installation of rooftop solar panels on the Thomas Elementary School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-o
No objection to the final design for the installation of rooftop solar panels on Building 2 of the Fire Training Facility, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-p
No objection to the final design for the installation of rooftop solar panels on the Sharpe Health School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-q
No objection to the final design for the installation of rooftop solar panels on the Ferebee-Hope Recreation Center, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-r
No objection to the final design for the installation of rooftop solar panels on the Hart Middle School, as shown in materials received and dated 30 December 2015. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-s
No objection to the concept design to replace the existing restaurant addition in the courtyard of the Hotel Monaco (General Post Office/Tariff Commission Building) for the Poste Brasserie restaurant, as shown in materials received and dated 8 January 2016. File new submission of construction drawings, including details and dimensions for the delegated final review by the Commission staff. Refer to DC Historic Preservation Office.
CFA 21/JAN/16-t
No objection to design Option 1 for the proposed Inherent Resolve Campaign Medal, as shown in materials received and dated 30 December 2015.