CFA 21/APR/16-a
CFA 21/APR/16-b
CFA 21/APR/16-c
No objection to the final design for the proposed replacement doors at the main Indiana Avenue entrance of the H. Carl Moultrie I Courthouse, as shown in materials received and dated 7 April 2016, provided the glass panels in the new doors match the adjacent glazing of the Indiana Avenue entrance facade. Refer to DC Historic Preservation Office.
CFA 21/APR/16-d
No objection to the proposed renovation and rehabilitation of the Influent Gatehouse, Castle Gatehouse, West Shaft Gatehouse, and Meigs's Vault, including the adjacent Circular Platform, at the Georgetown Reservoir, as shown in materials received and dated 8 April 2016. Refer to DC Historic Preservation Office.
CFA 21/APR/16-e
No objection to the final plans for the exterior rehabilitation of the Flume Building, Switchgear/Transformer Building, and the North and South Clearwell Gatehouses for the McMillan Water Treatment Plant and Reservoir, as shown in materials received and dated 8 April 2016. Refer to DC Historic Preservation Office.
CFA 21/APR/16-f
CFA 21/APR/16-g
No objection to the installation of a vinyl sign band identifying the Metropolitan Branch Trail on the northwest side of the trail bridge over Florida Avenue, NE, as shown in materials received and dated 7 April 2016.
CFA 21/APR/16-h
CFA 21/APR/16-i
No objection to the final design for the installation of replacement windows and a new rooftop mechanical screen wall on the C. W. Harris Elementary School, including painted building identification graphics adjacent to the main entrance, as shown in materials received and dated 6 April 2016. Refer to DC Historic Preservation Office.
CFA 21/APR/16-j
No objection to the concept design for the proposed renovation, alterations, and additions to the Watkins Elementary School, as shown in materials received a dated 7 April 2016.
CFA 21/APR/16-k
No objection to the final design for the renovation, alterations, and additions to the Ron Brown Middle School to modernized the structure to accommodate the Empowering Males High School, as shown in materials received a dated 7 April 2016. Alterations include replacement windows and doors, new roofing materials, reconfigured building hyphen, new security vestibules at the main entry, and landscape improvements. Refer to DC Historic Preservation Office.