CFA 16/JUN/16-a
No objection to the final design for the installation of a rooftop egress bridge over the main entrance atrium to connect the roof deck on Pod J at the north eastern corner of the building complex to Pod K, as shown in materials received and dated 2 June 2016. Approval is conditional on the receipt of the final construction documents. Refer to DC Historic Preservation Office.
CFA 16/JUN/16-b
CFA 16/JUN/16-c
No objection to the final design for a new guard booth, landscape alterations to Court Building A to improve access to the loading dock, a replacement garage door, and a rooftop vent on Building A, as shown in materials received and dated 2 June 2016. Refer to DC Historic Preservation Office.
CFA 16/JUN/16-d
No objection to the final plans for the proposed installation of rooftop wireless telecommunications antennas on the Wilber Wright Building (Federal Office Building 10B), as shown in materials received and dated 3 June 2016.
CFA 16/JUN/16-e
No objection to the final plans for the proposed installation of rooftop wireless telecommunications antennas on the Stewart Lee Udall Department of Interior Building, as shown in materials received and dated 3 June 2016.
CFA 16/JUN/16-f
No objection to the final plans for the proposed installation of rooftop wireless telecommunications antennas on the Frances Perkins Building, Department of Labor, as shown in materials received and dated 3 June 2016.
CFA 16/JUN/16-g
No objection to the final plans for the proposed installation of rooftop wireless telecommunications antennas on the James V. Forrestal Building, Department of Energy, as shown in materials received and dated 3 June 2016.
CFA 16/JUN/16-h
No objection to the final plans for the proposed installation of rooftop wireless telecommunications antennas on the Central Heating and Refrigeration Plant, as shown in materials received and dated 3 June 2016.
CFA 16/JUN/16-i
CFA 16/JUN/16-j
No objection to the proposed revisions to the previously approved design for the main portico entrance and the north and south side porches, including a new accessible ramp to the north porch, on the Duke Ellington School of the Arts, as shown in materials received and dated 6 June 2016. Refer to DC Historic Preservation Office.
CFA 16/JUN/16-k
No objection to the final plans for the installation of acoustical wall enclosures to screen the existing rooftop mechanical equipment on the Bunker Hill Elementary School (Brookland Education Campus) building, as shown in materials received and dated 7 June 2012. Refer to DC Historic Preservation Office.