CFA 21/JUL/22-a
Project approved by delegation. See letter dated 29 June 2022. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-b
No objection to final design for installation of additional chain link fencing with barbed wire along the north boundary of the Key Bridge Boathouse, per supplemental materials received 24 June 2022. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-c
Rte. du Cimetiere Americain
Colleville-sur-Mer, France
No objection to concept design for expansion of existing restroom facilities and creation of a visitor waiting area, per materials received 7 July 2022.
CFA 21/JUL/22-d
No objection to concept design for infrastructure and site improvements at the new Foreign Missions Center on the former Walter Reed Army Medical Center campus, per materials received 7 July 2022. The design, documented at 35%, conforms with previously approved Foreign Missions Center Master Plan (2019).
CFA 21/JUL/22-e
No objection to concept design for temporary pedestrian protection barriers at the south side of the National Archives Building, per materials received 7 July 2022. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-f
No objection to final design for alterations to the National Gallery Sculpture Garden, per materials received 7 July 2022. Scope of work includes a new ADA-compliant ramp; paving of walkways; a new mobile food service kiosk; new benches; and new trash cans. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-g
No objection to final design for a new permanent pedestrian access control point facility at the northeast side of the Pentagon, per materials received 7 July 2022. Final design conforms to previously approved concept design. Refer to Virginia State Historic Preservation Office.
CFA 21/JUL/22-h
No objection to concept design for renovations and additions to the Sheridan Building on the Armed Forces Retirement Home campus, per materials received 7 July 2022. Scope of work includes enclosure of rear balconies; alterations to fenestration; and construction of new entrance vestibule. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-i
No objection to final design for modifications to existing penthouse- and parapet-mounted cellular antenna arrays, per materials received 7 July 2022.
CFA 21/JUL/22-j
No objection to final design for modifications to existing penthouse- and parapet-mounted cellular antenna arrays, per materials received 7 July 2022.
CFA 21/JUL/22-k
No objection to final design for seven penthouse-mounted radio and GPS antennas required for WMATA operations, per materials received 7 July 2022. Final receive antenna location will be determined based on field testing.
CFA 21/JUL/22-l
No objection to concept design for new two-story addition at the southwest corner of the existing school building for a new child development center, per materials received 7 July 2022. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-m
No objection to final design for removal of existing barriers and installation of two new anti-ram wedge barriers at the entrance to the underground parking garage of the Henry J. Daly Building, per materials received 7 July 2022. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-n
No objection to final design for front-lit channel letter sign reading "Mayweather Boxing + Fitness," per supplemental materials received 8 July 2022. Refer to DC Historic Preservation Office.
CFA 21/JUL/22-o
No objection to final design for illuminated blade sign reading "Mayweather Boxing + Fitness," per supplemental materials received 8 July 2022. Refer to DC Historic Preservation Office.