CFA 20/JUL/23-a
Rte. du Cimetiere Americain
Colleville-sur-Mer, France
No objection to the final design for expansion of the existing restroom facilities and creation of a visitor waiting area, per materials received 6 July 2023.
CFA 20/JUL/23-b
CD2 02130
Seringes-et-Nesles, France
No objection to the final design to construct two barrier-free walkways between the parking area and the main entrance of the visitor services building, per materials received 6 July 2023. Scope of work includes interlocking brick pavers at the pedestrian crosswalk, and new rose and grass plantings to match the existing landscape
CFA 20/JUL/23-c
No objection to the final design for the installation of new entrance canopies, per materials received 6 July 2023. The canopy designs, which are consistent with previous Commission advice, will be installed at the following five Washington Metropolitan Area Transit Authority Metrorail stations as previously approved: Archives/Navy Memorial, Arlington National Cemetery, Judiciary Square North, Smithsonian, and U Street/African-American Civil War Memorial East.
CFA 20/JUL/23-d
No objection to the final design for building renovations and landscape improvements to an existing fast food restaurant on the base, per materials received 6 July 2023.
CFA 20/JUL/23-e
No objection to the final design for the installation of seven outdoor exercise stations at Bolling Green Park on the base, per materials received 6 July 2023.
CFA 20/JUL/23-f
No objection to the final design for the installation of a new mechanical equipment yard at the Armed Forces Retirement Home, per materials received 6 July 2023.
CFA 20/JUL/23-g
No objection to the final design for modifications to this existing triangle park, per materials received 6 July 2023. Scope consist of new permeable pavers, tables with seating and umbrellas, game tables, bike racks, street vendor spaces, additional shade trees, and new DPR signage.
CFA 20/JUL/23-h
No objection to the concept design for the installation of a new landscape terrace at the Hill Center, per materials received 6 July 2023, with the suggestion to shift the terrace slightly to the northwest. Please continue to work with the staff on the development of the design in anticipation of a final submission.
CFA 20/JUL/23-i
No objection to the concept design for a new music room addition and a relocated kitchen and cafeteria for the existing school, per materials received 6 July 2023.
CFA 20/JUL/23-j
No objection to the final design for bridge and road repairs at Fletchers Boathouse, 4940 Canal Road, NW, per materials received 7 July 2023. (Originally submitted under case number SL 23-134.)
CFA 20/JUL/23-k
No objection to the final design for three building signs at 141 N Street, NE, per materials received 7 July 2023. (Originally submitted under case number SL 23-132.)