CFA 18/JAN/24-a
No objection to the concept design for alterations to exterior doors at the Pentagon for security improvements, per materials received 5 January 2024. Scope of work includes replacement of 108 exterior doors. Refer to Virginia Department of Historic Resources.
CFA 18/JAN/24-b
No objection to the proposed modification to existing rooftop cellular antenna arrays owned by AT&T on the Hubert Humphrey Building, as shown in materials received 4 January 2024, PROVIDED all unused or obsolete telecommunication equipment is removed and new equipment is painted to match the color of the adjacent surfaces. Refer to DC Historic Preservation Office.
CFA 18/JAN/24-c
No objection to the proposed modification to existing rooftop cellular antenna arrays owned by AT&T on the Robert C. Weaver Federal Building, as shown in materials received 4 January 2024, PROVIDED all unused or obsolete telecommunication equipment is removed and new equipment is painted to match the color of the adjacent surfaces. Refer to DC Historic Preservation Office.
CFA 18/JAN/24-d
No objection to the installation of infrastructure at the St. Elizabeths East Campus associated with 13th Street, SE per materials submitted on 18 December 2023.
CFA 18/JAN/24-e
No objection to the final design for stonework repairs at Eastern Market per materials received 3 January 2024, PROVIDED a sample of the replacement sandstone is sent to the staff for review and approval prior to the commencement of work. Scope of work consists of replacing existing stonework on the building in several locations.
CFA 18/JAN/24-f
No objection to the concept design for a new central boiler plant at the DC Department of Corrections per materials received 4 January 2024. The project scope is to construct a new 3,600-square-foot central boiler plant for use by the campus.
CFA 18/JAN/24-g
Site work and landscape design approved by delegation. See letter dated 11 January 2023. This approval excludes the “Storm Wall” bas-reliefs and the “Unity Shield” of the central fountain, which are still under development. Refer to DC Historic Preservation Office.
CFA 18/JAN/24-h
Project approved by delegation. See letter dated 27 September 2023. Final design conforms with the previous recommendations of the Commission.