CFA 18/JUL/24-a
No objection to the final design for new photovoltaic array on the roof of the Department of Education Headquarters Building, per materials received 6 June 2024 and supplemental material received 3 July 2024 as the solar panels will have a low profile and placed away from the edge of the roof, and will not be visible from the ground. Refer to DC Historic Preservation Office.
CFA 18/JUL/24-b
No objection to the final design for the removal of an existing elevator at the Memorial Amphitheater per materials received on 3 July 2024. The scope includes the removal of an existing elevator and repair of the flooring where it is located.
CFA 18/JUL/24-c
No objection to the final design for replacement lighting fixtures near the Arlington National Cemetery welcome center, per materials received 3 July 2024.
CFA 18/JUL/24-d
No objection to the final design for the installation of 18 small ground-mounted field pole antennas to expand the existing wireless network bringing public wi-fi access to the Custis Walk and other parts in the north area of Arlington National Cemetery, as shown in materials received and dated 3 July 2024. This is the second phase of this wireless network and the first phase was approved in 2018.
CFA 18/JUL/24-e
No objection to the concept design for a temporary modular classroom campus per materials received 3 July 2024. The scope of the project includes the installation of modular classroom buildings; a new multipurpose tent to be used as a cafeteria and a gymnasium; decks, ramps, and stairs to connect the classroom buildings, and a parking lot with a new access drive.
CFA 18/JUL/24-f
No objection to the final design for a reconfiguration of existing public space for a new park, per materials received 3 July 2024 and supplemental documents received 8 July 2024. Scope of work includes new paving, plantings, furniture, signage, and public art. Submit public art for review by the Commission when ready. Refer to DC Historic Preservation Office.
CFA 18/JUL/24-g
No objection to the replacement of existing siding on MacArthur High School building, per materials received 3 July 2024. Scope of the project is to replace deteriorating metal siding on the southern and eastern elevations of the existing building as well as screening existing rooftop equipment with the same metal panels.