CFA 16/JUL/26-a
Project approved by delegation. See letter dated 9 July 2026.
CFA 16/JUL/26-b
Project approved by delegation. See letter dated 9 July 2026. Refer to DC Historic Preservation Office.
CFA 16/JUL/26-c
No objection to final design for modifications to Euclid Elementary School, per materials received 2 July 2026. Final submission is consistent with previously approved concept design.
CFA 16/JUL/26-d
No objection to final design for construction of a new aquatics center addition to an existing recreation center, per materials received 2 July 2026. Final submission is consistent with previously approved concept design.
CFA 16/JUL/26-e
No objection to final design for restoration of historic gatehouse and quarters, per materials received 7 July 2026. Gatehouse scope of work includes: repair and restoration of exterior wall materials, including stone, brick, wood, and ornamental metals; and modifications and improvements to site paving. Quarters scope of work includes: replacing the roof and lightning protection system; repairs and replacement of skylights; window replacement and restoration; select replacement of exterior doors; foundation waterproofing, including sump pumps and exterior areaway drains; repair and replacement of gutters and downspouts; and mechanical system upgrades. Refer to DC Historic Preservation Office.
CFA 16/JUL/26-f
No objections to concept design for modifications to existing monuments, per supplemental materials received 9 July 2026. Scope of work includes the correction of existing names and the addition of up to 120 total names to the Protestant, Catholic, and Jewish Chaplains Monuments. The Protestant Chaplains Monument's concrete base would be rebuilt in stone to accommodate the new name plaque.
CFA 16/JUL/26-g
Woking, Surrey, United Kingdom
No objection to final design for installation of a new roof drainage system for the cemetery chapel, per materials received 2 July 2026. Final submission is consistent with previously approved concept design.
CFA 16/JUL/26-h
Rte. du Cimetiere Americain
Colleville-sur-Mer, France
No objection to final design for repairs to visitor center roof, per materials received 2 July 2026. Scope of work includes: raising the west edge of the skylight panels to establish positive drainage and direct rainwater toward the adjacent flat roof; replacing the waterproofing membrane of the flat roof; and replacement in kind of the frames supporting the curved skylight over the Sacrifice Gallery.