CFA 17/MAY/12-a
No objection to the final design for the installation of a perimeter security barrier system, which includes bollards and vehicular control devices at the public entrances of the United States Institute of Peace, and a new egress stair and pathway on the west side of the building, as shown in materials received and dated 3 May 2012.
CFA 17/MAY/12-b
No objection to the proposed repair and/or replacement of portions of the roof on the Visitors Center at Arlington National Cemetery, as shown in materials received and dated 3 May 2012.
CFA 17/MAY/12-c
CFA 17/MAY/12-d
No objection to the final design for the renovation of and addition to the historic Gales School building including landscaping, site furnishings, and amenities in public space, as shown in materials received and dated 9 May 2012.
CFA 17/MAY/12-e
No objection to the general concept design for landscape alterations and improvements to Rose Park including expansion of the flagpole plaza, playground, and metal fence, and the installation of new landscaping and new brick paths on a sand setting bed as shown in supplemental drawings dated 23 April 2012. Recommend reconfiguring the serpentine path and the terminuses of the brick paths. File new submission of construction drawings, including details and dimensions, for review by the Commission. (See case number OG 12-213.)