CFA 15/SEP/05-a
No objection to the proposed additions and alterations for a new childcare center as shown in drawings received and dated 1 September 2005. Complies with comments from previously reviewed concept during 19 May 2005 meeting.
CFA 15/SEP/05-b
No objection to the proposed wire roof antenna to be located on the Ariel Rios Building with limited visibility from the street as shown in drawings received and dated 1 September 2005.
CFA 15/SEP/05-c
No objection to the proposed sculpture of John Philip Sousa sculpture and 4 ft. base to be located near the Marine Barracks Annex as shown in drawings received and dated 6 September 2005. Complies with comments from previously reviewed concept during 21 July 2005 meeting.
CFA 15/SEP/05-d
No objection to the proposed renovation of Building W-101 as shown in drawings received and dated 6 September 2005, including the breezeway enclosure, entrance door and canopies, mechanical system requirements. Final review pending submission of construction documents.
CFA 15/SEP/05-e
No objection to the proposed renovation of the central building at the Municipal Fish Wharf to house the Virgo Fish House, property manager's office, electrical utility room and public toilets as shown in drawings received and dated 15 August 2005.
CFA 15/SEP/05-f
No objection to the proposed cell antennas and associated equipment as shown in drawings received and dated 9 September 2005.