OG 21-263
Returned without action. Permit application for new sign has been inactive for an extended period of time. File new submission at DCRA with detailed and dimensioned drawings for review by the Commission.
OG 21-268
No objection to concept design for restoration of four windows and replacement of garage door, per supplemental materials received 13 January 2022. Submit detailed and dimensioned drawings for review by the Commission under existing permit application OG 22-018 (HPA 22-028).
OG 22-007
No objection to issuance of permit for the installation of operable, louvered wood shutters sized to fit the individual window openings on front facade, per supplemental materials received 31 January 2022, PROVIDED shutters are mounted to the brickmould and shutter dog hardware is driven into mortar, not masonry; existing penetrations in the mortar should be used where possible. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-034
Returned without action. Application for revision to permit was withdrawn at the written request of the applicant on 24 January 2022.
OG 22-048
No objection to concept design for alterations to historic greenhouse, per materials received 20 January 2022, PROVIDED the existing entrance door is altered to accommodate change in floor level and reused, existing transom is retained, new cabinetry on the interior is made to replicate existing, and screening or low landscaping is included at new frameyard structures. File permit submission at DCRA with detailed and dimensioned drawings for review by the Commission.
OG 22-049
Returned without action. Permit application for installation of rooftop solar panels was withdrawn at the written request of the applicant on 17 January 2022.
OG 22-050
No objection to issuance of permit for replacement of existing roof, per supplemental materials received 31 January 2022, which indicate a new lead-coated copper standing seam roof at the front and a thermoplastic polyolefin (TPO) roof membrane at the rear. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-054
Recommend AGAINST issuance of permit for installation of French doors in the projecting bay storefront, which were regrettably installed without a permit, per materials received 14 January 2022 . File new submission at DCRA for either the restoration of the wood storefront or a more compatible door design, with detailed and dimensioned drawings for review by the Commission.
OG 22-056
The Commission regrets that work commenced without permit. No objection to issuance of permit to demolish the brick garden wall along the eastern edge of the rear yard and build a horizontal slat, wood fence and gate, and install one painted metal light fixture at the front entrance, per supplemental materials received 26 January 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-057
No objection to issuance of permit for installation of roof at interior court and extension of first floor into a section of private pedestrian alley, per supplemental materials received 7 February 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-058
No objection to issuance of permit for installation of operable wood louvered shutters on the front facade, per supplemental materials received 26 January 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-059
No objection to issuance of permit for rear addition, per supplemental materials received 25 January 2022, PROVIDED a materials mockup, including samples of the undulating metal louver system, is installed on site and reviewed by OGB prior to construction. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-060
No objection to issuance of permit for rehabilitation of property, per supplemental materials received 21 January 2022; work includes replacement of roof; restoration of windows; and repair/replacement of wood siding. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-061
No objection to issuance of permit for rehabilitation of property, per materials received 14 January 2022; work includes replacement of roof; repair of windows; replacement of non-historic basement window; repointing masonry walls; and repair/replacement of damaged wood siding, trim, and cornice. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-063
No objection to concept design for installation of exterior cellular equipment, per materials received 31 January 2022, PROVIDED all exterior hardware is driven into mortar, not masonry. File permit submission at DCRA with detailed and dimensioned drawings for review by the Commission.
OG 22-064
No objection to issuance of permit for alterations to include enclosure of garage with windows; repair and partial replacement of wood trim; restoration of front door; repair of windows; and in-kind replacement of slate roof at front and replacement of standing seam metal roof with copper at rear, per supplemental materials received 30 January 2022, PROVIDED as much of the existing slate roof shingles are retained as feasible. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-066
Returned without action. Application for revised permit was withdrawn at the written request of the applicant on 21 January 2022.
OG 22-067
No objection to issuance of permit for roof replacement and repair, per materials received 14 January 2022, including replacement of front 3-tab shingles with architectural shingles in "silver birch." Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-068
No objection to issuance of permit for repair and replacement of existing slate shingles on front mansard roof, per supplemental materials received 21 January 2022, PROVIDED existing slate is salvaged and reused as much as possible and evenly interspersed with new slate. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-069
No objection to issuance of permit for replacement of existing two doors and two-part storefront window with new wood doors and new four-part wood window, per materials received 2 February 2022, which indicate that single-pane glass will be specified for the new glazing. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-071
No objection to issuance of permit for replacement of existing asphalt shingle roof and gutters/downspouts, per supplemental materials received 25 January 2022. Drawings indicate that new roof will be standing seam metal painted matte-black and gutters will have a half-round profile. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-074
No objection to concept design for site work, alterations at front stoop, and alterations of fenestration, per supplemental materials received 21 January 2022, PROVIDED stoop is either retained or carefully reconstructed with retention of pier and base blocks where possible, design for handrail is restudied, a paint analysis is completed for permit submission, and an elevator overrun mockup is reviewed by OGB staff prior to permit submission. File permit submission at DCRA with detailed and dimensioned drawings, including photos of the inner vestibule doors, for review by the Commission.
OG 22-075
No objection to revise previously approved permit OG 20-117/HPA 20-206 to install a metal overhead bike access door on the west elevation, revise the ground floor window proportions on the south elevation of the new addition, paint the buildings a neutral color palette loosely based on the historic paint analysis, and; use exterior cladding materials per mock-up panel reviewed on site on 11 January 2022, PROVIDED the louver cladding is changed to "knotty pine," per supplemental materials received 28 January 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-077
No objection to issuance of permit for select replacement and repair to the existing wood siding in-kind except for one course, closest to the ground, to be replaced with aluminum on the west elevation; repairs to the roof and cornice, windows, and stoop; and replacement of the second floor window on the west elevation with a full frame, true-divided-light wood window PROVIDED the exterior muntins are putty profile and match the muntin width on the north and east elevation, per supplemental drawings received 27 January 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-078
No objection to issuance of permit to reconstruct previously demolished front porch, alter fenestration at front basement, and construct a new rear addition, per supplemental materials received 27 January 2022. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-079
Returned without action. Concept application for alterations to permit-approved design was withdrawn at the written request of the owner on 27 January 2022.
OG 22-080
No objection to revision to permit for change in window type for four windows on north elevation, per supplemental materials received 20 January 2022, which includes replacing the windows with fire-rated windows as required by DCRA. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 22-081
Returned without action. Permit application for installation of camera and sensor was withdrawn at the written request of the applicant on 20 January 2022.
OG 22-082
No objection to concept design for replacement of basement windows with single-pane, one and two-light wood windows, per supplemental materials received 28 January 2022, PROVIDED the existing brickmould and carved wood lintels are retained; if either cannot be salvaged, they must be replicated and replaced in kind. File permit submission at DCRA with detailed and dimensioned drawings for review by the Commission.