No objection to issuance of permit for proposed alterations and addition of two-story rear porch as shown in supplemental drawings received and dated 16 March 2005 which indicate retention of stucco finish if repair of brick wall is not possible, and 12-inch columns. Working drawings conform to recommendations given during concept review. See previous Recommendation (OG 05-008). Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 05-098
OG 05-101
OG 05-102
OG 05-103
No objection to issuance of permit for proposed alterations, including Pella 2/2 wood replacement windows, sign composed of non-illuminated pin-mounted letters no taller than 12-inches high reading 'Jean Luc' with removal of existing projecting banner, re-construction of cornice and brackets to match existing and new fence no taller than 7-ft high as per code requirements; and no objection to issuance of permit for proposed two-story rear addition with basement and for new shed structure at rear of property, as shown in supplemental drawings received and dated 29 April 2005. The use of PVC trim was NOT approved. Working drawings conform to approved concept design. See previous Recommendations (OG 05-050 and OG 04-157). Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 05-104
No objection to issuance of permit for proposed one-story rear addition and for replacement front door to match detailing of door at adjoining house, as shown in supplemental drawings received and dated 18 March and 22 February 2005. Use of PVC trim was NOT approved. Wood trim was approved as noted on red-lined drawings. Working drawings conform to approved concept design. See previous Recommendation (OG 05-016). Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 05-105
No objection to issuance of permit for proposed reconstruction and extension of front porch, new steps and alterations to basement level for new entrance as shown in supplemental drawings received and dated 3 March 2005. Working drawings conform to approved concept, with minor modifications. See previous Recommendation (OG 05-080). Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 05-106
OG 05-107
OG 05-108
OG 05-110
OG 05-111
Returned without Action. Concept submission was superseded by permit application under case OG 05-115.
OG 05-112
OG 05-113
OG 05-114
OG 05-115
No objection to issuance of permit for proposed one-story side addition to replace pergola as shown in option with the removal of second brick arch as shown in supplemental drawings received and dated 16 March 2005. Working drawings conform to approved concept design. See previous Recommendations (OG 04-191 and 05-023). Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 05-116
No objection to issuance of permit for proposed roof deck at rear of house and for alterations to front, including garage door, entrance canopy and new cornice with railing. Working drawings conform to approved concept. See previous Recommendation (OG 04-274). The Commission notes that the conditions in this property and adjacent structures allow for a roof deck that otherwise would not have been approved. Note is made that permit application is pending final Zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.