SL 10-045
No objection to the issuance of permit for alterations to a rear carriage house for use as a dwelling, as shown in materials received and dated 5 February 2010. Design conforms with previously approved concept. Refer to DC Historic Preservation Review Board. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.
SL 10-046
No objection to the issuance of permit for the installation of two non-illuminated monument signs, as shown in materials received and dated 5 February 2010. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.
SL 10-047
No objection to the issuance of permit for a new marquee with a logo sign, above the eastern doorway on Pennsylvania Avenue, and for alterations to extend an existing decorative fence, as shown in materials received and dated 5 February 2010. Refer to DC Historic Preservation Review Board. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.
SL 10-048
No objection to the issuance of permit for the installation of one new window, the enlargement of three existing window openings, and the replacement of window guards on two existing window openings, as shown in materials received and dated 5 February 2010. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.
SL 10-049
No objection to the issuance of permit for new and replacement rooftop cellular antennas, as shown in materials received and dated 5 February 2010, provided that the antennas and their support structures are painted to match the adjacent walls of the penthouse. Refer to DC Historic Preservation Review Board. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval.