SL 08-117
No objection to the issuance of permit for the installation of a wood board fence to completely replace existing fence in kind, as shown in materials received and dated 5 September 2008 and supplemental materials received and dated 11 September 2008. Note: Because the application is pending final zoning and public space review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
SL 08-118
SL 08-119
SL 08-120
No objection to the issuance of permit for construction of a new office building as the third phase of Station Place, as shown in materials received and dated 5 September 2008. The design of this building conforms with the previously-approved concept submission for Station Place (SL 02-004) and with the design of the two previously-constructed phases (SL 02-078 and SL 03-063). Note: Because the application is pending final zoning review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
SL 08-121
SL 08-122
SL 08-123
SL 08-124
No objection to the issuance of a revised permit for modifications to the previously-approved addition and renovations, as shown in materials received and dated 5 September 2008 and supplemental materials received and dated 17 September 2008. Note: Because the application is pending final zoning and structural review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
SL 08-126
SL 08-127
SL 08-128
SL 08-129
SL 08-130
No objection to the issuance of permit for the installation of an illuminated sign, as shown in materials received and dated 5 September 2008. Note: Because the application is pending final zoning and structural review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
SL 08-132
No objection to the concept design for exterior restoration, repair, and replacement in kind of masonry, roof, and windows; new accessible entrance and ramps at south terrace; modifications to side drive and parking lot with new rain canopies; infill of two interior courtyards and one courtyard visible on north elevation; new infill facade and terrace at north elevation; new roof-top corridor; and new roof-top photovoltaic system, as shown in materials received and dated 9 September 2008. Encourage further consultation with Commission staff as design develops, particularly at north infill fa\'e7ade and east rain canopies. Refer to the Historic Preservation Review Board.
SL 08-133
No objection to the issuance of permit for the construction of additions at the third floor and rear, as shown in materials received and dated 12 September 2008. Design conforms to previously-approved concept. Either documented option for the north elevation of the third floor addition is acceptable. Note: Because the application is pending final zoning and structural review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
SL 08-134
No objection to the issuance of permit for the construction of two vehicular sallyports at the entrance and exit gates, including the extension of the existing chancery security walls, as shown in materials received and dated 12 September 2008. Note: Because the application is pending final zoning and structural review, any subsequent modifications to the approved design must be re-submitted to the Commission for approval.