Recommendation
No objection to the final design for the proposed building renovation and freestanding addition to the former John F. Cook Elementary School for the Mundo Verde Public Charter School, as shown in materials received and dated 5 September 2013, with the exception of the replacement windows in the historic building. The treatment of the replacement windows should replicate the original mullion patterns or the existing windows should be retained and repaired were needed. Recommend consultation with the Commission staff and the DC Historic Preservation Office before the next submission for the replacement windows.