CFA 19/SEP/13-a
CFA 19/SEP/13-b
No objection to the installation of one additional wall-mounted exhibition sign panel to match the existing panels on the southwest entrance ramp, as shown in materials received and dated 5 September 2013. The designs conforms to the previously approved sign installation reviewed in July 2009.
CFA 19/SEP/13-c
CFA 19/SEP/13-d
No objection to the final design for building alterations and additions for the U.S. Department of Agriculture Child Development Center, as shown in materials received and dated 5 September 2013. Proposed work includes the addition of a new entryway, a new access ramp and fencing, and a conversion of an existing window into a doorway.
CFA 19/SEP/13-e
No objection to the final designs for the temporary installation of various commercial communication antennas on the St. Elizabeths West Campus for the Department of Homeland Security, as shown in materials received and dated 4 September 2013. Project conforms with previously approved antenna system. Refer to DC Historic Preservation Office.
CFA 19/SEP/13-f
No objection to the revised final design for the proposed Secure Access Lane Remote Screening Facility adjacent to the 9/11 Memorial on the Pentagon Reservation, as shown in materials received and dated 3 September 2013.
CFA 19/SEP/13-g
No objection to the final design for the renovation of the Herb Garden at the U.S. National Arboretum, as shown in materials received and dated 5 September 2013. The work will include the removing and replacing wood components on existing benches; removing and replacing brick pavers; modifying the irrigation system; removing the existing shed and replacing with new; removing and replacing trellis, fencing, and gates; enlarging the enclosed fenced work yard; and removing the existing gravel access road and replacing with a new porous paving access road from Meadow Road.
CFA 19/SEP/13-h
No objection to the final design for the Phase II extension of the Flowering Tree Walk to complete the loop around the main meadow at the U.S. National Arboretum, as shown in materials received and dated 5 September 2013. Details and materials conform to previously approved and installed Phase I of the walk.
CFA 19/SEP/13-i
No objection to the final design for a new vehicular storage building and operations facility for the U.S. Army Transportation Agency to be located in Fort McNair at the corner of B and Canal Streets, SW, as shown in materials received and dated 6 September 2013.
CFA 19/SEP/13-j
CFA 19/SEP/13-k
CFA 19/SEP/13-l
No objection to the revised selection of a darker accent brick for the exterior walls of the building hyphens on the north facade of the new gymnasium addition to the Cesar Chavez Public Charter School (the former Bruce Public School), as shown in materials received and dated 5 September 2013. Submission conforms to previously approved final design.
CFA 19/SEP/13-m
No objection to the final design for the proposed building renovation and addition to the Ruth K. Webb Elementary School at 1375 Mt. Olivet Road, NE, for the KIPP DC Charter Schools, as shown in materials received and dated 23 August and 4 September 2013.
CFA 19/SEP/13-n
No objection to the final design for the proposed building renovation and freestanding addition to the former John F. Cook Elementary School for the Mundo Verde Public Charter School, as shown in materials received and dated 5 September 2013, with the exception of the replacement windows in the historic building. The treatment of the replacement windows should replicate the original mullion patterns or the existing windows should be retained and repaired were needed. Recommend consultation with the Commission staff and the DC Historic Preservation Office before the next submission for the replacement windows.
CFA 19/SEP/13-o
CFA 19/SEP/13-p
CFA 19/SEP/13-q
CFA 19/SEP/13-r
CFA 19/SEP/13-s
CFA 19/SEP/13-t
CFA 19/SEP/13-u
CFA 19/SEP/13-v
CFA 19/SEP/13-w
No objection to the proposed concept and final design for a new sidestream wastewater treatment facility at the Blue Plains Wastewater Treatment Plant, as shown in drawings received and dated 10 September 2013.
CFA 19/SEP/13-x
No objection to the revised design for a proposed new canopy at the northwest entrance door, as shown in materials received and dated 10 September 2013.
CFA 19/SEP/13-y
No objection to the proposed final design for the first phase of the modernization of and additions to the Shepherd Elementary School building, as shown in materials received and dated 29 July 2013. It is understood that subsequent phases will complete the full project within five years of completion of the first phase of modernization.
CFA 19/SEP/13-z
Project approved by delegation. See letter dated 5 September 2013. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office. ACTION PREVIOUSLY DELEGATED TO STAFF