Property
Quadrangle Loading Dock
Description
Replacement guard booth
Review Type
Final
Previous Review
Recommendation
No objection to the final design for a replacement guard booth at the Quadrangle Loading Dock that serves the Freer and Sackler Galleries, Ripley Center, National Museum of African Art, Arts and Industries Building, and the Smithsonian Castle, per materials received 7 March 2022. Final design is consistent with approved concept. Refer to DC Historic Preservation Office.