Recommendation
No objection to the issuance of a permit for the installation of three aluminum-clad replacement windows at the second floor on the front facade of an existing house, as shown in materials received and dated 4 April 2025 and supplemental materials received and dated 16 April 2025. Window selection and installation matches two replacement windows previously installed at the first floor front facade. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.