Recommendation
No objection to issuance of permit for proposed skylight, two matching dormers with hipped roofs and mechanical louvers, and the replacement of the metal doors at building entrances with solid wood paneled doors per drawings received 23 June 2016 which indicate dormers clad in sheet metal and set back from the east wall of the building. File new submission of working drawings for mechanical vault, including dimensions and details of surface grate, with permit application for review by the Commission. Refer to the Historic Preservation Review Board. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit. Refer to DC Historic Preservation Office.