CFA 19/FEB/15-a
No objection to the final design for a new soil, sand, and salt storage facility at the existing maintenance complex on Patton Drive, as shown in materials received and dated 5 February 2015.
CFA 19/FEB/15-b
No objection to the final design for additions and modifications to the Great Ape House for the installation of a smoke control system, as shown in materials received and dated 5 February 2015. Refer to DC Historic Preservation Office.
CFA 19/FEB/15-c
No objection to the final design for the relocation and restoration of the historic Watch Box, Building 185, to return it close to its original site in the Washington Navy Yard from the Naval Support Facility Indian Head, Maryland, as shown in materials received and dated 5 February 2015. Refer to DC Historic Preservation Office.
CFA 19/FEB/15-d
No objection to the proposed installation of two interim cell phone antennas on existing wooden utility poles on the west campus of St. Elizabeths, as shown in materials received and dated 5 February 2015. Refer to DC Historic Preservation Office.
CFA 19/FEB/15-e
No objection to concept design for proposed skylight and dormers at the historic Hyde School building, part of the Hyde-Addison Elementary School complex, as shown in supplemental drawings received 28 January 2015, which indicate two matching dormers with hipped roofs and mechanical louvers. File new submission of working drawings, including dimensions and details, for review by the Commission.