CFA 15/SEP/16-b
No objection to the final design for the proposed installation of a rooftop photovoltaic solar panel array on the Main Treasury Building, as shown in materials received and dated 2 September 2016.
CFA 15/SEP/16-c
CFA 15/SEP/16-d
CFA 15/SEP/16-e
No objection to the proposed building renovation and new exterior exit stair from the 1st and 2nd floors, as shown in materials received and dated 1 September 2016.
CFA 15/SEP/16-f
CFA 15/SEP/16-g
CFA 15/SEP/16-h
No objection to the final design for an outdoor classroom for the Leckie Elementary School, as shown in materials received and dated 30 August 2016. Refer to DC Historic Preservation Office.
CFA 15/SEP/16-i
No objection to the final design for the installation of rooftop mechanical equipment with screen enclosures on the Jefferson Middle School Academy, as shown in materials received and dated 1 September 2016. Refer to DC Historic Preservation Office.
CFA 15/SEP/16-j
Project approved by delegation. See letter dated 27 July 2016. Final design conforms to previously approved concept submission. Refer to DC Historic Preservation Office.
CFA 15/SEP/16-k
Project approved by delegation. See letter dated 22 August 2016. Final design conforms to previously approved concept submission. Refer to DC Historic Preservation Office.