CFA 15/SEP/21-a
Owner
Smithsonian Institution
Property
Quadrangle Loading Dock
Description
Replacement guard booth
Review Type
Concept
Recommendation
No objection to the concept design for a replacement guard booth at the Quadrangle Loading Dock that serves the Freer and Sackler Galleries, Ripley Center, National Museum of African Art, Arts and Industries Building, and the Smithsonian Castle, as shown in materials received and dated 31 August 2021. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-b
Owner
Smithsonian Institution
Property
Arts and Industries Building
Description
Temporary installation of exhibition banners
Review Type
Final
Recommendation
No objection to the final plans for the temporary installation of exhibit banners on the Arts and Industries Building, as shown in materials received and dated 2 September 2021. The banners will be removed at the conclusion of the "Futures" exhibit in July 2022, but the mounting hardware, which is not permanently attached to the building, may be reinstalled for the display of banners for future exhibitions. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-c
Owner
U.S. Department of the Navy
Property
United States Naval Observatory
Description
Improvements to the USNO helicopter landing zone
Review Type
Final
Recommendation
No objection to the final plans for improvements to the existing USNO helicopter landing zone at the United States Naval Observatory, as shown in materials received and dated 27 August 2021. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-d
Owner
U.S. General Services Administration
Property
U.S. Department of Homeland Security
Description
Installation of four telephone poles with top-mounted cameras
Review Type
Final
Recommendation
No objection to the final plans for the installation of four wood telephone poles with top-mounted security cameras on the campus side of the historic brick wall along Martin Luther King, Jr. Avenue, SE, as shown in materials received and dated 2 September 2021. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-e
Owner
D.C. Department of General Services
Property
Jefferson Middle School Academy
Description
Teaching pavilion for the DC Students Construction Trades Foundation
Review Type
Concept
Recommendation
No objection to the concept design for the installation of an outdoor teaching pavilion for the DC Students Construction Trades Foundation on the south side of the Jefferson Middle School Academy grounds, as shown in materials received and dated 2 September 2021. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-f
Owner
D.C. Department of General Services
Property
Kenilworth Elementary School
Description
Addition for new elevator
Review Type
Final
Recommendation
No objection to the final plans for the installation of a new elevator at Kenilworth Elementary School, as shown in materials received and dated 2 Septmeber 2021. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-g
Owner
D.C. Department of General Services
Property
Duke Ellington Track and Field Park
Description
Renovation of existing track and field, upgrade existing field houses, and a new dog park
Review Type
Concept
Recommendation
No objection to the concept design for the renovation of the Duke Ellington Track and Field Park, including the replacement of the running track, the reconstruction of the natural turf field, the addition of a pickle ball court and a volleyball court, the mitigation of slope erosion, the replacement of the lighting system, and the modernization of the existing field houses to provide universal access, as shown in materials received and dated 30 August 2021. The concept design also includes the option for adding a new 8,500-square-foot dog park. Refer to DC Historic Preservation Office.
CFA 15/SEP/21-h
Owner
D.C. Department of General Services
Property
D.C. Correctional Facility
Description
Exterior structural upgrades
Review Type
Final
Recommendation
No objection to the final plans for the proposed exterior structural upgrades to the D.C. Correctional Detention Facility building, as shown in materials received and dated 30 August 2021. The project includes the re-caulking of all the joints in the precast panels and windows; roof repairs; and the replacement of the coping on the parapet walls.
CFA 15/SEP/21-i
Owner
National Park Service
Property
Franklin Park
Description
Rehabilitation of park - Entry signs
Review Type
Final
Previous Review
Recommendation
No objection to the final plans for the installation of two entry signs for Franklin Park, as shown in materials received and dated 3 September 2021. Refer to DC Historic Preservation Office.