CFA 21/NOV/24-a
No objection to the final design for the installation of handrails at four exterior stairways to improve pedestrian safety, per supplemental materials received 8 November 2024, PROVIDED the "recommended final design" option is selected. Refer to Virginia Department of Historic Resources.
CFA 21/NOV/24-b
No objection to the final design of the construction of a new employee access control facility at the Pentagon Metro entrance, per materials received 8 November 2024. Materials indicate the final design is consistent with the previously approved concept, which included the double height volume option; the use of channel glass above the proposed canopy; and a granite watertable.
CFA 21/NOV/24-c
No objection to the final design for the reconstruction of Bridges 47 & 78 at Watts Branch, per materials received 8 November 2024. The submission materials indicate natural stone is proposed for the abutments on both bridges as approved. Refer to DC Historic Preservation Office.
CFA 21/NOV/24-d
No objection to concept design for a new pedestrian bridge to be located at the meeting point of the Chesapeake & Ohio Canal National Historical Park and the Rock Creek and Potomac Parkway, and adjacent to the former West Heating Plant, per supplemental materials received 24 October 2024, PROVIDED that the trail intersection at the north end of the bridge is addressed in the next submission, and with the understanding that the larger wayfinding program and other trail intersections will be addressed in future phases of work. Refer to DC Historic Preservation Office.
CFA 21/NOV/24-e
No objection to concept design for stabilization and repair of existing boat house, per materials received 18 October 2024. Scope of work includes in-kind replacement and stabilization measures to address issues with structural framing, exterior siding, roofing, and water intrusion; installation of a functional restroom; and upgrade of utility services to meet current building codes. Refer to DC Historic Preservation Office.
CFA 21/NOV/24-f
No objection to the final design for extending the height of the perimeter fences around the Ariel Rios Federal Building, per materials received 8 November 2024.
CFA 21/NOV/24-g
No objection to the final design for installation of three access ladders at the Ariel Rios Federal Building, per materials received 8 November 2024. These proposed permanent ladders will allow access to the existing green roof areas which area currently only accessible using a portable lift.
CFA 21/NOV/24-h
No objection to the final design for the installation of new wireless antennas on the penthouse of the Hubert Humphrey Building, per materials received 8 November 2024, PROVIDED each panel antenna, wall mounting hardware, and wires are painted to match the adjacent wall color.
CFA 21/NOV/24-i
No objection to final design for signage for Barry's, per materials received 8 November 2024 (Originally submitted under case number SL 25-013.) Refer to DC Historic Preservation Office.
CFA 21/NOV/24-j
No objection to the concept design for wayfinding signage at the National Archives Building, per materials received 8 November 2024.
CFA 21/NOV/24-k
No objection to the final design for the installation of new antennas on one northern balcony of the National Air and Space Museum, per materials received 8 November 2024.
CFA 21/NOV/24-l
No objection to the final design for the stabilization of the Stone Bridge and Beach Drive Bridge at the National Zoological Park, per materials received 8 November 2024.
CFA 21/NOV/24-m
No objection to the final design for installing a metal sign and bench at Emergency Egress Hatch VF3, per materials received 8 November 2024.
CFA 21/NOV/24-n
No objection to final design for penthouse-mounted omni radio (3) and GPS (2) antennas required for WMATA operations, per materials received 8 October 2024. (Originally submitted under case number SL 25-012.)
CFA 21/NOV/24-o
No objection to the final design for renovations and additions to the J.O. Wilson Elementary School building and the landscape, per materials received 8 November 2024.
CFA 21/NOV/24-p
No objection to the final design for a temporary modular campus to be constructed on the open field at John Burroughs Elementary School, per materials received 8 November 2024.
CFA 21/NOV/24-q
No objection to the concept design for renovations and additions to the Barnard Elementary School, per materials received 8 November 2024. Scope of work includes a new two-story classroom addition; new building entrance; new courtyard pathways; a playing field; and solar panels and plantings at the new building roof.
CFA 21/NOV/24-r
No objection to the final design for the construction of a new racquet sports facility, which would be connected to the existing tennis and learning center via a new pedestrian bridge, per materials received 8 November 2024.
CFA 21/NOV/24-s
No objection to concept design for demolition of the existing two-story building and the construction of a new two-story brick recreation center and site improvements, PROVIDED the design of the southern entrance vestibule is further refined and copper is used as a cladding material for the spandrels. File design development submission with material samples for review by the Commission. Refer to DC Historic Preservation Office.
CFA 21/NOV/24-t
No objection to the final design the installation of six public artworks at existing bus stops, per materials received 8 November 2024. The permanent installations include sculptures that can be used as seating.
CFA 21/NOV/24-u
No objection to the final design for the installation of a public artwork on an existing plinth, per materials received 8 November 2024.