CFA 20/FEB/25-a
Project approved by delegation. See letter dated 31 January 2025.
CFA 20/FEB/25-b
Project approved by delegation. See letter dated 11 February 2025.
CFA 20/FEB/25-c
No objection to concept design for reconstruction of historic Sheridan Gate as shown in Option 3 (internal pinning), per materials received 6 February 2025. Gate location and reassembly was approved as part of the cemetery's Southern Expansion Project (CFA 19/NOV/20-1). Refer to Virginia Department of Historic Resources.
CFA 20/FEB/25-d
No objection to final design for implementation of new planting plan within the existing planting beds at Lincoln's Cottage, per materials received 6 February 2025. Plan is intended to enhance the interpretive experience of the cottage and is consistent with the AFRH master plan's design guidelines. Refer to DC Historic Preservation Office.
CFA 20/FEB/25-e
No objection to final design for installation of four retractable vehicular bollards at the buildingĂs southwest vehicular entrance, per materials received 6 February 2025. Refer to DC Historic Preservation Office.
CFA 20/FEB/25-f
No objection to final design of single options for the obverse and reverse of the 2025 issue of the Sacagawea Golden Dollar, per materials received 6 February 2025. Design is identical to the original 2000 issue of the Sacagawea dollar coin and consistent with the recommendation of the Citizens Coinage Advisory Committee.
CFA 20/FEB/25-g
No objection to installation of outdoor seating for Potbelly, per materials received __ February 2025, PROVIDED seating is provided only on the upper plaza adjacent to the business and not within the pedestrian clearway along the sidewalk.
CFA 20/FEB/25-h
No objection to concept design for modifications to existing building (former Bertie Backus Middle School), per materials received 6 February 2025. Project scope allows full utilization of the building (which has partial water damage), modernizes building systems, and facade updates. Refer to DC Historic Preservation Office.
CFA 20/FEB/25-i
No objection to final design for renovation and additions Barnard Elementary School, per materials received 6 February 2025. Final design is consistent with the previously approved concept design.
CFA 20/FEB/25-j
No objection to final design for the installation of a new site wall and fence, using the preferred brick Option 3, at Turner Elementary School, per materials received 6 February 2025. Scope of work includes the construction of a new brick site wall and fence. Refer to DC Historic Preservation Office.
CFA 20/FEB/25-k
No objection to concept design for renovations and additions to Randall Recreation Center, per materials received 6 February 2025. Scope of work includes renovating the historic Randall Recreation Center building and adding a trellis, replacing the existing pool house, and creating a new landscape with gathering spaces with new public art locations as outdoor amenities. Refer to DC Historic Preservation Office.
CFA 20/FEB/25-l
No objection to concept design for a new fitness area at Oxon Run Park, per materials received 6 February 2025. Scope of work includes seven new fitness stations, a new shade canopy, a water fountain, bicycle racks, benches, and trees. Refer to DC Historic Preservation Office.