CFA 21/FEB/13-a
CFA 21/FEB/13-b
CFA 21/FEB/13-c
CFA 21/FEB/13-d
No objection to the final plans for a third-floor addition to the Marine Corps Exchange, Building 26, on the Joint Base Myer-Henderson Hall, as shown in materials received and dated 8 February 2013.
CFA 21/FEB/13-e
No objection to the final plans for a temporary structure to house the service equipment of Fire and Emergency Medical Services (FEMS) Engine House No.14 at 401 Farragut Street, as shown in materials received and dated 7 February 2013. The FEMS Engine House No. 14 will occupy the temporary structure for the duration of the renovation of the firehouse at 4801 North Capitol Street, NE.
CFA 21/FEB/13-f
No objection to the final plans for proposed alterations, including repair to masonry, replacement wood doors to match original doors, new window between doors on front facade to match original condition, repair of existing historic windows, replacement of non-historic windows with custom-made wood windows matching details and profiles of historic windows, and new custom-made wood awning storm windows set back from face of brick, as shown in supplemental drawings dated 13 February 2013. (See case OG 13-089, HPA 13-141.) New shutters were deleted from the scope of work. File new submission of drawings for new mechanical systems, to eliminate individual window units and vent on side wall, for review by the Commission. Recommend aluminum overhead doors be replaced with wood doors. Refer to DC Historic Preservation Office. Refer to DC Historic Preservation Office.
CFA 21/FEB/13-g
CFA 21/FEB/13-h
CFA 21/FEB/13-i
CFA 21/FEB/13-j
First phase of project approved by delegation. See letter dated 16 January 2013. Construction drawings conform to previously approved final design. ACTIONS PREVIOUSLY DELEGATED TO STAFF