CFA 17/JAN/13-a
CFA 17/JAN/13-b
No objection to the proposed facade revisions to the previously approved final design for a new chancery building for the Embassy of Morocco to be constructed on Lot #4 in the International Center, as shown in material received and dated 19 December 2012. Submission conforms to previously approved concept and final design.
CFA 17/JAN/13-c
No objection to the final design for a new gated access control point and security barriers at the main entrance to the Pentagon Heating and Refrigeration Plant compound, southeast of the Pentagon Building at Route 110, as shown in materials received and dated 3 January 2013. Design details of fence, buildings, and security barriers conform to previously approved installations at the Pentagon complex.
CFA 17/JAN/13-d
CFA 17/JAN/13-e
No objection to the proposed concept design for the Joint Base Anacostia-Bolling Overflow and Diversion Structure and site enhancements, as shown in materials received and dated 16 November 2012.
CFA 17/JAN/13-f
CFA 17/JAN/13-g
CFA 17/JAN/13-h
CFA 17/JAN/13-i
CFA 17/JAN/13-j
CFA 17/JAN/13-k
Project approved by delegation. See letter dated 3 January 2013. Final plans conform to previously approved concept design. Refer to DC Historic Preservation Office. ACTION PREVIOUSLY DELEGATED TO STAFF
CFA 17/JAN/13-l
Project approved by delegation. See letter dated 3 January 2013. Construction drawings conform to previously approved final design. Refer to DC Historic Preservation Office. ACTION PREVIOUSLY DELEGATED TO STAFF