CFA 18/JUN/09-a
No objection to the proposed new rooftop laboratory exhausts, as shown in materials received and dated 4 June 2009. Refer to the DC Historic Preservation Review Board.
CFA 18/JUN/09-b
No objection to the final design to relocated Guard Booth #4 and for the addition of two bus shelters on the north side of the East Parking lot, and the addition of a cable barrier to the back side of the fence facing Nebraska Avenue and other modifications, as shown in materials received and dated 4 June 2009. Submission is a revision to previously approved design (see case number: CFA 18/OCT/07-3).
CFA 18/JUN/09-c
No objection to the proposed construction of a temporary pre-security screening facility for the Eisenhower Executive Office Building (EEOB) on State Place, as shown in materials received and dated 4 June 2009, provided that this temporary structure will be in place no longer than 20 months during the renovation of the EEOB (see case number: CFA 15/SEP/05-8).
CFA 18/JUN/09-d
CFA 18/JUN/09-e
CFA 18/JUN/09-f
CFA 18/JUN/09-g
No objection to the final plans for the addition and alterations and additions to the Georgetown Branch Library, 3260 R Street, NW as shown in materials received and dated 27 May 2009 and 10 June 2009. This project was reviewed and approved by the Old Georgetown Board in its meeting of 4 June 2009. Refer to the Historic Preservation Review Board.