SL 22-061
Returned without action. Permit submission for the insert installation of three replacement windows in the front facade of an existing building, as shown in materials received and dated 4 February 2022, has been withdrawn at the written request of the applicant.
SL 24-068
No objection to the issuance of a permit for the installation of three new panel antennas, six remote radio units, and related equipment on an existing penthouse exterior wall and building rooftop for Dish Wireless, as shown in materials received and dated 2 February 2024 and supplemental materials received and dated 8 March 2024, PROVIDED that the antennas and their mounts be painted to match the building surface behind. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-076
No objection to the issuance of a permit for the installation of eight full-frame Fibrex replacement windows in an existing house, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-077
No objection to the issuance of a permit for the installation of a rooftop solar panel system at an existing house, as shown in materials received and dated 8 March 2024. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-078
No objection to the issuance of a permit for the installation of a rooftop solar panel system at an existing house, as shown in materials received and dated 8 March 2024, and supplemental materials received and dated 13 and 15 March 2024. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-079
No objection to the issuance of a permit for the installation of a rooftop solar panel system at an existing house, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-080
No objection to the concept for a new accessible ramp at the rear entrance of an existing building, as shown in materials received and dated 8 March 2024 and supplemental materials received and dated 12 March 2024, PROVIDED that the new railing be painted to match the existing railing to remain, pending consultation on the design of the railing, and pending the receipt of supplemental materials. Refer to the National Trust for Historic Preservation for historic easement. Refer to DC Historic Preservation Office. Note: This is a concept approval only. When ready, submit the permit drawings and a permit application to DOB for review by the Commission.
SL 24-081
No objection to the issuance of a permit for the installation of seven full-frame wood replacement windows at the front elevation of an existing rowhouse, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-082
No objection to the issuance of a permit for the installation of six new panel antennas and mounts, 15 remote radio heads, and associated equipment within a stealth enclosure at an existing rooftop for T-Mobile, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-083
No objection to the issuance of a permit for the installation of a movable glass wall system to replace a portion of the curtainwall at the 11th floor terrace of an existing building, as shown in materials received and dated 8 March 2024 and supplemental materials received and dated 13 March 2024. Previously proposed pergola has been removed from the scope of work. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-084
No objection to the issuance of a permit for the installation of two freestanding signs within existing garden beds for the DACOR Bacon House, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Refer to DC Public Space Committee. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-085
No objection to the issuance of a permit for modifications to an existing rooftop terrace and the 11th floor balconies of a penthouse condominium unit, including the installation of an 8'-4" tall white aluminum shade structure, planters, an outdoor kitchen, a fire pit, and furniture, as shown in materials received and dated 8 March 2024. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-086
No objection to the issuance of a revised permit for the restoration of the roof and bell tower of an existing church, as shown in materials received and dated 8 March 2024. The revisions include providing gilded copper at the bell tower dome in lieu of plain copper, installing coated copper on the intermediate metal apron roofs in lieu of plain copper, and eliminating the eight previously proposed stucco-finish access panels at the base of the bell tower. Submission largely conforms with previous permit submission. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-087
No objection to the issuance of a permit for the construction of a replacement exterior site stair in the rear yard of an existing house, as shown in materials received and dated 8 March 2024. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-088
No objection to the concept for the replacement of an existing wood shingle roof with standing seam copper, the installation of a new roof access hatch at the rear, and the removal of a plywood balustrade, as shown in materials received and dated 8 March 2024. Refer to the National Trust for Historic Preservation for historic easement. Refer to DC Historic Preservation Office. Note: This is a concept approval only. When ready, submit the permit drawings and a permit application to DOB for review by the Commission.
SL 24-089
No objection to the issuance of a permit for the installation of a sidewalk seating area at a new restaurant for Arlo DC Hotel, including lighting option A for string lights only, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Recommend against lighting option B with additional downlights. Refer to DC Public Space Committee. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-090
No objection to the issuance of a permit for the installation of a pair of double doors to replace existing storefront glazing at the east facade of an existing building, as shown in materials received and dated 8 March 2024 and supplemental materials received and dated 13 March 2024, pending the receipt of supplemental materials. Submission largely conforms with previously approved concept. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-091
No objection to the issuance of a permit for the installation of four full-frame wood replacement windows in one unit of an existing building, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-092
No objection to the issuance of a permit for the installation of a rooftop solar panel system at an existing house, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-093
No objection to the issuance of a permit for the installation of eleven full-frame wood replacement windows in one unit of an existing building, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-094
No objection to the issuance of a permit for the installation of two full-frame wood replacement windows in an existing house, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.
SL 24-095
No objection to the issuance of a permit for a rear addition to an existing house, as shown in materials received and dated 8 March 2024, pending the receipt of supplemental materials. The previously proposed second curb cut, second driveway, second attached garage, new in-ground pool, and associated new enclosure are not included in this review. Refer to DC Public Space Committee. Refer to DDOT Urban Forestry Division. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.