OG 14-347
HPA number
HPA 14-680
Property
Residence
Description
Repair rear garden wall
Review Type
Permit
Recommendation
Returned without Action. Permit application has been inactive for an extended period. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 15-064
HPA number
HPA 15-105
Property
Commercial
Description
Projecting sign
Review Type
Permit
Recommendation
Returned without Action. File new complete submission at DCRA with correct address. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 15-067
HPA number
HPA 15-110
Property
Georgetown University - Leavey Hotel
Description
Security gate
Review Type
Permit
Recommendation
Returned without Action. Submission materials and a site visit on 15 December 2014 indicate that proposed metal fences and gates at the Leavey Hotel will not be visible from a public thoroughfare. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 15-075
HPA number
HPA 15-119
Property
Residence
Description
Alterations to stoop, site work
Review Type
Concept
Recommendation
The Commission regrets that a HVAC condenser unit and screening was installed in the front yard and public space prior to review or permit. Returned without Action. Permit application was withdrawn at the written request of applicant.
OG 15-076
HPA number
HPA 15-120
Property
Residence
Description
Alterations to masonry stoop for storage area
Review Type
Permit
Recommendation
Returned without Action. Submission materials and a site visit on 15 December 2014 indicate that proposed alterations to area beneath masonry stoop will not be visible from a public thoroughfare. Note: Any subsequent modifications to the approved design, including those made during DCRA technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.