Recommendation
No objection to the issuance of a revised permit for the renovation of and additions to an existing house, as shown in materials received and dated 5 September 2025, pending the receipt of supplemental materials. Revisions include new facade and roof designs in a different architectural style, including revisions to window and door profiles, removal of two windows on the east facade, incorporation of transom windows, simplification of the metal balustrade design, and addition of limestone relief bands; the addition of a chimney on the west elevation and green roofs on the sun room and garage; and changes to the exterior lighting and landscape design. Rooftop solar panels shown in the submitted documents are placeholders only and are not included in this review; forward a new permit submission for solar panels when ready. Refer to DC Public Space Committee. Refer to DC Historic Preservation Office. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval.