Site work includes replacement and new walls, fences, gates, perimeter security elements, terraces, parking lots, walkways, lighting, and all other constructed elements, as well as trees.
A complete final review submission for site work includes, in addition to the basic requirements for a final review submission, the following documents:
- all requirements for concept review as further developed
- scaled and dimensioned foundation and architectural detail drawings of the proposed work
- manufacturer’s product specifications clearly indicating the proposed lighting, fencing, materials, etc.
It is essential that all notes and dimensions be accurate and legible.