Consent Calendar: CFA Meeting — 20 September 2018

CFA 20/SEP/18-a

Location

West Potomac Park, 17th Street and Independence Avenue, SW
Washington, DC
United States

Property
World War II Memorial and Korean War Veterans Memorial
Description
Wireless computer network system (WiFi)
Review Type
Final
Previous Review
Recommendation
No objection to the final plans for the installation of a local area wireless computer networking system (WiFi) for public access to the Internet at the World War II Memorial and the Korean War Veterans Memorial, as shown in materials received and dated 2 October 2015, provided the panel antennas are painted to match the color of the surfaces on which they are mounted. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-b

Location

1400 Independence Avenue, SW
Washington, DC
United States

Property
USDA Headquarters--South Building
Description
Wireless telecommunication antennas
Review Type
Final
Previous Review
Recommendation
No objection to the proposed installation of rooftop wireless telecommunication antennas on the South Building of the USDA Headquarters, as shown in materials received and dated 6 September 2018. This proposal conforms with previously approved designs for antenna installations on the South Building. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-c

Location

3001 Connecticut Avenue, NW
Washington, DC
United States

Owner
Smithsonian Institution
Property
National Zoological Park
Description
Temporary relocation of a radio communications antenna to Elephant House roof
Review Type
Final
Recommendation
No objection to the final plans for the temporary relocation of existing internal staff radio communications antennas from the roof of the Bird House to the roof of the Elephant House, as shown in materials received and dated 31 August 2018, provided once the the Bird House renovation project is complete, in approximately two years, the antennas will be returned to its roof. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-d

Location

6315 5th Street, NW
Washington, DC
United States

Property
Coolidge High School
Description
Sports stadium renovation and modernization
Review Type
Concept
Previous Review
Recommendation
No objection to the concept design for the renovation and modernization of the sports stadium at Coolidge High School, as shown in materials received and dated 6 September 2018. Option 4 is the preferred graphics treatment for the stadium. The proposed project is a second phase of the previously approved school modernization project. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-e

Location

1230 Sumner Road, SE
Washington, DC
United States

Property
Barry Farm Recreation Center
Description
Sculpture and additional security fencing/screening
Review Type
Final
Recommendation

No objection to the proposed final design for the installation of additional security fencing at the pool entrance, and the installation of the sculpture, Iwah, by artist Jay Coleman in the courtyard at the Barry Farm Recreation Center, as shown in materials received and dated 6 September 2018. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-f

Location

2700 Martin Luther King Jr. Avenue, SE
Washington, DC
United States

Property
Parcel 2 (Dorothea Dix Building area), Saint Elizabeths East Campus
Description
786 space interim parking lot
Review Type
Final
Previous Review
Recommendation
No objection to the final plans for the proposed construction of a 786 space interim surface parking lot on Parcel 2 (Dorothea Dix Building area) in the St. Elizabeths East Campus to support the Entertainment and Sports Arena and Gateway Pavilion, as shown in materials received and dated 18 July 2018, provided this interim surface parking lot is removed when additional structured parking facilities are provided as the East Campus is developed. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-g

Location

2730 Martin Luther King Jr. Avenue, SE
Washington, DC
United States

Property
RISE Center, Saint Elizabeths East Campus
Description
207 space interim parking lot
Review Type
Final
Previous Review
Recommendation
No objection to the final plans for the proposed construction of a 207 space interim surface parking lot on the existing parking lot to the south of the RISE Center on the St. Elizabeths East Campus to support the Entertainment and Sports Arena and Gateway Pavilion, as shown in materials received and dated 18 July 2018, provided this interim surface parking lot is removed when additional structured parking facilities are provided as the East Campus is developed. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-h

Location

1100 Alabama Avenue, SE
Washington, DC
United States

Property
Parcel 15, Saint Elizabeths East Campus
Description
204 space interim parking lot
Review Type
Final
Previous Review
Recommendation
No objection to the final plans for the proposed construction of a 204 space interim surface parking lot on Parcel 15 in the St. Elizabeths East Campus to support the Entertainment and Sports Arena and Gateway Pavilion, as shown in materials received and dated 18 July 2018, provided this interim surface parking lot is removed when additional structured parking facilities are provided as the East Campus is developed. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-i

Location

1700 Rhode Island Avenue, NE
Washington, DC
United States

Property
Ward 5 Short-Term Family Housing
Description
Building renovation and six-story addition
Review Type
Final
Previous Review
Recommendation

Project approved by delegation. See letter dated 27 August 2018. Final design conforms to previously approved concept submission. Refer to DC Historic Preservation Office.

CFA 20/SEP/18-j

Location

Parking Lot 7, C Street, NE east of Oklahoma Avenue, along the Anacostia River
Washington, DC
United States

Owner
Events DC: Washington Convention and Sports Authority
Property
Robert F. Kennedy Stadium-Armory Campus
Description
Temporary multipurpose sports fields
Review Type
Final
Previous Review
Recommendation

Project approved by delegation. See letter dated 10 September 2018. Final design conforms to previously approved concept submission. Refer to DC Historic Preservation Office.