CFA 15/SEP/11-a
CFA 15/SEP/11-b
No objection to the replacement fence and security barrier around the Pentagon Heating Plant compound, as shown in materials received and dated 2 September 2011. Design details of new fence and security barrier conform to previously approved installations at the Pentagon complex.
CFA 15/SEP/11-c
No objection to the temporary installation of an equipment enclosure (prefabricated metal shed-type structure) around the previously approved temporary emergency boilers (see previous submission), as shown in materials received and dated 2 September 2011.
CFA 15/SEP/11-d
CFA 15/SEP/11-e
No objection to the final design for a replacement cover for the areaway at the front of the WMATA headquarters building, as shown in materials received and dated 19 August 2011.
CFA 15/SEP/11-f
CFA 15/SEP/11-g
CFA 15/SEP/11-h
No objection to the final plans for the installation of 11 new and 4 replacement electrical generators on various sites throughout Joint Base Fort Myer- Henderson Hall, Arlington, Virginia, as shown in materials received and dated 4 August 2011. It is understood that the installation of screen walls around the new equipment will be submitted as a separate project in FY 2012. Refer to Virginia State Historic Preservation Office.
CFA 15/SEP/11-i
CFA 15/SEP/11-j
No objection to the final plans for the installation of an enclosure for the existing boiler equipment at the Rader Health and Dental Clinic (Building 525) at Joint Base Fort Myer-Henderson Hall, Arlington, Virginia, as shown in materials received and dated 2 September 2011.
CFA 15/SEP/11-k
CFA 15/SEP/11-l
CFA 15/SEP/11-m
CFA 15/SEP/11-n
No objection to the concept design for a one-story classroom addition above the existing cafeteria wing, as shown in materials received and dated 26 August 2011. Design conforms to previously approved submission for the building renovation and other exterior modifications.
CFA 15/SEP/11-o
No objection to the proposed final plans for building alterations to windows and doors for restaurant tenant including new signs, as shown in materials received and dated 25 August 2011.
CFA 15/SEP/11-p
No objection to the final plans for the expansion of the loading dock for the US Army Band Building (Building #400), Joint Base Fort Myer-Henderson Hall, Arlington, Virginia, as shown in materials received and dated 2 September 2011.
CFA 15/SEP/11-q
Final designs and selections for the artwork and inscriptions approved by delegation. See letter dated 5 August 2011. Final designs and selections conform to previously approved submission. ACTIONS PREVIOUSLY DELEGATED TO STAFF
CFA 15/SEP/11-r
Final design approved by delegation. See letter dated 1 September 2011. Final design conforms to previously approved submission. Refer to DC Historic Preservation Office. ACTIONS PREVIOUSLY DELEGATED TO STAFF