CFA 19/JUN/08-a
No objection to the final design for the construction of a new five-story office building for the DC Department of Employment Services as shown in materials received and dated 5 June 2008. Design conforms to previously approved concept (see case number CFA 18/NOV/04-13). Note: Any subsequent modifications to the approved design must be re-submitted to the Commission for approval.
CFA 19/JUN/08-b
No objection to the installation of rooftop photovoltaic panels on the roof of the North Building of the Department of Energy Headquarters, as shown in materials received and dated 2 June 2008.
CFA 19/JUN/08-c
No objection to the temporary installation of three electrochromic windows on the sixth floor of the west facade of the North Building of the Department of Energy Headquarters, for a two-year duration, as shown in materials received and dated 2 June 2008.
CFA 19/JUN/08-d
No objection to the installation of additional safety/security grilles at the entrance of the McPherson Square Metro Station in the three openings on the northeast corner of the U.S. Department of Veterans Affairs headquarters building. The new grilles are to match the existing grille, as shown in materials received and dated 23 May 2008.
CFA 19/JUN/08-e
No objection to the temporary installation of two double and one single re-locatable classroom units on the school grounds, as shown in material received and dated 3 June 2008, provided the classroom units are in place for no more than four years or until the renovations on the main school building are completed. Refer to the Historic Preservation Review Board.
CFA 19/JUN/08-f01
CFA 19/JUN/08-f02
CFA 19/JUN/08-g
No objection to the concept design for the reconstruction of the schoolyard and installation of new landscaping, as shown in materials received and dated 6 June 2008. (See case SL 08-091.) Refer to the Historic Preservation Review Board.
CFA 19/JUN/08-h
No objection to the issuance of permit for the installation of a new sign to identify school, as shown in materials received and dated 6 June 2008. (See case SL 08-085.) Refer to the Historic Preservation Review Board.
CFA 19/JUN/08-i
No objection to the proposed donor recognition program, which includes lettering on the fixed-glass center panel of the entranceway to the Public Education Center, and an inscribed inscription on the inside face of the terrace wall of the Peacemaker Plaza facing the main atrium.
CFA 19/JUN/08-j
CFA 19/JUN/08-k
No objection to the installation of vendor signs as shown in materials received and dated 6 June 2008.
CFA 19/JUN/08-l
No objection to the proposed waterproofing repairs to the plaza deck; grading modifications for improved drainage and handicap access; elimination of handrails at doorway; and the installation of new lawn panels with curbs, as shown in Option A, in the materials received and dated 5 June 2008.
CFA 19/JUN/08-m
No objection to the installation of recycled synthetic slate tiles and solar roof tiles to replace existing 78-year old natural slate roof, as shown in material received and dated 5 and 12 June 2008. Refer to the Historic Preservation Review Board.