OG 24-355
2900 - 2902 Dumbarton Street, NW
United States
No objection to concept design for interior renovation to excavate basement and convert a bulkhead on the east elevation to a window well and restore existing windows, per supplemental materials received __ July 2025, PROVIDED the proposed window well on the west elevation is either deleted from the design or if it remains, its location further studied in relation to the existing fenestration. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-214
3253 P Street, NW
United States
No objection to concept design to construct a second story addition on existing masonry garage, per supplemental materials received 11 June 2025. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-215
1431 33rd Street, NW
United States
No objection to concept design to replace gate on the north side of the rear yard with new wood door and to install a green roof on the east wing of the house, per supplemental materials received 20 June 2025, which indicate no changes to the existing rooftop terrace and railing. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-219
3520 Prospect Street, NW
United States
No objection to issuance of permit to replace the Lobby Entrance doors and ramp; replace the Entrance Hall doors; replace Exit Gate A; and replace Exit Gate B and its ramp on the rooftop of Georgetown University's Car Barn, per supplemental materials received 11 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-229
1000 Potomac Street, NW
United States
No objection to the concept design for the Flour Mill office to residential and retail conversion with additions and building and site alterations, per supplemental materials received 23 June 2025, PROVIDED that the proposed screen wall on the 1922 Mill’s penthouse is pewter gray; two punched window openings at each level are created on the west elevation of the 1922 Mill; and the applicant works with staff on the design of the proposed painted sign on the west elevation of the 1922 Mill and studies a painted sign reading "Pioneer Mills" on the north elevation of the 1847 Mill. File design development submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-232
3419 R Street, NW
United States
No objection to issuance of permit for repaving, per supplemental materials received 24 June 2025. Note that pergola and shed were removed from the application and are not part of this approval. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-239
1340 28th Street, NW
United States
No objection to issuance of permit to replace the standing seam and membrane roofs and flashing in kind, per supplemental materials received 18 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-240
1365 Wisconsin Avenue, NW
United States
No objection to issuance of permit to replace and install wall-mounted antennas to the second story of the east elevation on existing frame and to replace roof-mounted antennas inside existing shrouds, per supplemental materials received __ July 2025, PROVIDED the western shroud is turned so its length is parallel to the south building wall, the east shroud is extended to meet the roof, and both are painted to match the masonry building, so as to resemble chimneys. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-243
1529 Wisconsin Avenue, NW
United States
No objection to issuance of permit for replacement of five inappropriate 1/1 vinyl windows on the front elevation with single-glazed, 6/6, true-divided-lite, single-hung wood windows, per supplemental materials received 18 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-245
1638 30th Street, NW
United States
No objection to issuance of permit for replacement of existing gutter liner with copper, per materials received 13 June 2025, PROVIDED the existing slate is reinstalled. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-246
1691 35th Street, NW
United States
No objection to issuance of permit to replace the standing seam and membrane roofs and flashing in kind, per the supplemental materials received ___ July 2025, PROVIDED the applicant provide a typical detail specification for both the proposed drip edge and replacement roof material. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-248
3025 Dent Place, NW
United States
No objection to issuance of permit to replace roofing and the gutter liner, per the supplemental materials received ___ July 2025, PROVIDED the applicant provide a detail for the gutter with the replacement liner labeled as copper; the roof of the rear, one-story bump out cannot be covered in a membrane roof and instead must be replaced with either hand-crimped metal; architectural-grade asphalt shingles, or slate tiles, in that order of preference; and the applicant provide standard detail specifications for the flashing on the rear bump out. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-249
3077 M Street, NW
United States
No objection to issuance of permit for sign reading "J.CREW" over the front entrance, per supplemental materials received 30 June 2025. Note that second sign on 31st Street above storefront window was removed from application after OGB did not support it. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-258
1680 Wisconsin Ave, NW
United States
No objection to issuance of permit to install two flagpoles at the Embassy of Romania, per the supplemental materials received ___ July 2025, PROVIDED both flagpoles are smaller than the initially proposed; the applicant provide a detail that shows the flagpoles installed through the mortar joints and into a structurally sound base behind the bricks; and the applicant provide a detail that shows the cleats installed in mortar and not brick. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-259
2812 N Street, NW
United States
No objection to issuance of permit to replace the shutters and rear porch columns; alter the fenestration on the rear elevation, and install rooftop condensers on the rear elevation, per the supplemental materials received ___ July 2025, PROVIDED the applicant provide detailed drawings that include cross sections for the proposed replacement fenestration; the proposed windows and doors conform with the OGB's Window Policy and Guidelines; and the Polystone columns are hand-painted. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-260
3051 N Street, NW
United States
No objection to issuance of permit for replacement of existing wood door at rear elevation with wood door to match existing, per supplemental materials received 20 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-262
3257 O Street, NW
United States
No objection to issuance of permit for relocation of garage opening and new garage door, per supplemental materials received 18 June 2025, which indicate the new door would be wood. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-265
1401 33rd Street, NW
United States
No objection to issuance of permit to remove brick infill within the opening and install a single-glazed, wood sash window on the first floor of the west elevation, per the supplemental materials received ___ July 2025, PROVIDED the applicant provide a dimensioned drawing of the existing window to serve as the model to confirm the proposed window would match. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-267
1683 34th Street, NW
United States
No objection to issuance of permit to replace the third and fourth floor windows on the east and south elevation with full frame, simulated-divided-light, wood replacement windows, per materials received 13 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-269
3901 Yates Road, NW
United States
No objection to concept design for new HVAC unit for Yates Field House, per supplemental materials received 23 June 2025, PROVIDED the existing 7-ft-tall fence is replaced with a 10-ft-tall vertical-board fence to screen the equipment. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
TBD
3700 Water Street, NW
United States
No objection to permit design for stabilization and repair of Washington Canoe Club boathouse, per the supplemental materials received ___ July 2025, PROVIDED all the exterior trim is wood and not composite; the roof proposed for the east bay is five-V crimp metal with the panels similar in scale to the existing; specifications or details are provided for gutters and down spouts, if applicable; and any new fencing is submitted for review prior to installation as part of a future submission.